Customer | +Well |
Location | Bestway Medhub, Stoke-on-Trent |
Project Type | Low energy LED lighting installation |
Description | +Well’s Bestway Medhub warehouse in Stoke-on-Tent is fully automated and one of the biggest pharmaceutical wholesale sites in the UK.
One of our most prolific clients, +Well is the third largest pharmacy chain in the UK. Energy consumption and increased lighting levels were the main aim of this project, due to +Well’s Green Commitment project. By removing the existing high-level, high energy consuming discharge lighting systems, we were delighted to reduce power consumption by 50%. Not only is power consumption reduced, with our expertise LED lighting installation, we were able to increase lighting levels by 20%. Due to there being no requirement for re-lamping, our LED lighting solutions are also a great low maintenance option for large warehouses like this. The results from this project were a huge boost to +Well’s Green Commitment, giving them annual savings of 146.1 tons of Co2. The luminaries incorporated technology from Tridonic, Osram and ExOr, carting 5 year warranties and manufactured in the United Kingdom. |